Load Bank Solutions for Data Center Commissioning.

Datacenter Load Bank Middle East

Commissioning is defined as a reliability science that documents and validates the result of a data center’s design / build process. During data center commissioning, Load banks are used to do the performance test of the following types of supporting systems

  • Back-Up Generators
  • UPS Systems
  • ATS
  • Power Distribution Units (PDUs)
  • Computer Room Air Conditioning (CRAC) systems

Load bank test planning should occur as early in the overall project timeline as possible, because load bank testing promotes an iterative design model: Test specifications that are not validated initially can be referred back to engineers for redesign and optimization. This proactive, structured approach identifies problems before the facility becomes operational, ensuring that the IT infrastructure is able to perform at capacity upon deployment.